Skip to Main Content
Loading
Close
Loading
Important Alert
Covid 19 Information
Read on
Government
Services
Community
Business
How Do I...
Home
Government
Departments
Public Works
Engineering and Capital Projects Division
Flooding
Permits Required After a Flood
Permits Required After a Flood
Items Requiring a Permit
Remove/replace electrical wiring or conduits
Remove/replace electrical panel
Remove/replace furnace or boiler
Remove/replace water heater
Remove/replace roofing
Remove/replace siding
Items Not Requiring a Permit
Clean furnace, boiler, or water heater
Remove/replace carpet or tile
Remove/replace drywall or insulation
Remove/replace light fixtures
Remove/replace windows (same size opening)
Licensed Contractors
If you hire a contractor, please make sure that he/she is licensed to work in the Village of Wheeling. Contact your insurance company for recommendations and to assess the level of repair needed.
100-Year Flood Defined
Building In the Floodplain - Floodway
Community Rating System
Definitions
Elevation Certificates
Flood Insurance
Flood Maps
Flood Safety
Flooding Websites
Floodplain Ordinance
Floodproofing
Permits Required After a Flood
Real Time Flood Information
Revalidated Letters of Map Change (LOMC) (PDF)
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow