Skip to Main Content
Loading
Loading
Government
Services
Community
Business
How Do I...
Home
Government
Departments
Public Works
Engineering and Capital Projects Division
Flooding
Permits Required After a Flood
Permits Required After a Flood
Items Requiring a Permit
Remove/replace electrical wiring or conduits
Remove/replace electrical panel
Remove/replace furnace or boiler
Remove/replace water heater
Remove/replace roofing
Remove/replace siding
Items Not Requiring a Permit
Clean furnace, boiler, or water heater
Remove/replace carpet or tile
Remove/replace drywall or insulation
Remove/replace light fixtures
Remove/replace windows (same size opening)
Licensed Contractors
If you hire a contractor, please make sure that he/she is licensed to work in the Village of Wheeling. Contact your insurance company for recommendations and to assess the level of repair needed.
100-Year Flood Defined
Building In the Floodplain - Floodway
Community Rating System
Definitions
Elevation Certificates
Flood Insurance
Flood Maps
Flood Safety
Flooding Websites
Floodplain Ordinance
Floodproofing
Permits Required After a Flood
Real Time Flood Information
Revalidated Letters of Map Change (LOMC) (PDF)
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow