Chicken Coop Permit Requirements
The Village of Wheeling requires a permit for the installation and construction of residential chicken coops. The following information outlines permit submittal requirements, construction standards, zoning regulations, and inspection requirements.
Permit Submittal Requirements
The following items must be submitted prior to permit issuance:
Completed permit application
Signed contract including a clear scope of work
Plat of Survey showing property lines, setbacks, and the proposed location of the coop and run
Illinois Department of Agriculture Livestock License
Construction drawings for the proposed structure
Construction Requirements
All chicken coops must meet the following standards:
A covered enclosure shall be provided for housing hens
The coop structure shall not exceed twelve (12) square feet
A running area of at least six (6) square feet per hen is required
The combined total area of the coop and run shall not exceed one hundred (100) square feet
Coops must be constructed of durable, weather‑proof materials
Walls must be insulated and the structure shall be covered with an insulated blanket
Rodent control measures are required
No electricity is permitted in the structure, including heat lamps
Zoning Requirements
Chicken coops must comply with the following zoning standards:
Maximum roof height shall not exceed eight (8) feet
For pitched roofs, height shall be measured from the midpoint of the roof
Coops must be located a minimum of ten (10) feet from rear and side lot lines
Coops must be located at least ten (10) feet from any residence
Coops are not permitted in front yards or street‑facing yards
Additional Requirements
Roosters are prohibited
All areas where hens are kept must be clean and well‑maintained, with minimal accumulation of waste
If the applicant is not the property owner, a notarized letter of permission from the homeowner is required
Required Inspections
The following inspections are required as part of the permit process:
For questions regarding chicken coop permits or requirements, please contact the Building Department prior to beginning construction.